SADDLE CREEK RETENTION TREATMENT BASIN
The Saddle Creek Retention Treatment Basin is the fifth major project we’ve been awarded as part of the Clean Solutions for Omaha (CSO) program. The purpose of the Retention Treatment Basin (RTB) is to capture combined sewage and store or treat it during wet weather events. After a wet weather event, the RTB will use […]
METROPOLITAN UTILITIES DISTRICT PROJECTS
We are currently remodeling the Chemical Building at the Florence Water Treatment Plant. The building serves as step one of the water purification processes: storing, mixing, and distributing chemicals to purify water pulled in from the Missouri River. The project includes a new stair tower and new addition, as well as an almost complete gut […]
GREEN PLAINS
We have completed several major projects for Green Plains Inc. Green Plains produces 1.5 billion gallons of ethanol annually from 17 plants in strategic locations throughout the United States. Projects:• Wood River, Neb. – design-build towers to support cooling water lines• Central City, Neb. & Shenandoah, Iowa – construction of an energy center addition for […]
CRETE WASTEWATER TREATMENT PLANT IMPROVEMENTS
We constructed the Crete Wastewater Treatment Plant to replace the City’s original plant. Designed to be significantly more efficient, the new plant supported 5,000 people at completion, with the capability to accommodate growth to 12,000. Construction included an administration building, electrical blower building, grit removal structure, ultraviolet structure, aeration basins, dewatering structure and biosolids drying […]
YORK WATER RECLAMATION FACILITY
The original water reclamation facility was unable to keep up with the growing needs of the area. We upgraded the lift station and installed conveyance pipeline to a new facility. The new facility included a headworks grit screening building, two aeration basins, a biosolids holding tank, two clarifiers, a disinfection basin, and five reed beds. […]
SYNGENTA HUSK/SORT FACILITY REPLACEMENT
We replaced the process facility at Syngenta’s production site. Work included demolition of the existing building, breakroom/control building, vibration conveyors and incline conveyors, modification and reuse of the dryer fill tripper conveyors, and the removal and reinstallation of the conveyor towards the chopper building. The 2,500 square foot breakroom/control building contained a control room, breakroom, […]
AMERICAN CONCRETE WET CAST FACILITY
We constructed a new 26,000 square feet wet cast concrete production facility to allow large pieces of pre-cast concrete to be formed for various projects. Space was required for three crane ways, moving trucks, concrete buckets, rebar, and transporting the finished pieces – some weighing up to 25,000 pounds. To meet FEMA requirements, we used […]
WESTERN IOWA ENERGY – TANK FARM ADDITION
In 2012, we performed design-build construction, and installed two new 500,000-gallon biodiesel storage tanks and one new 145,000-gallon refined oil storage tank. These massive steel tanks were welded together on-site and set with steel ring foundations and a sand foundation. We prime-painted the exterior and wrapped each tank with two inches of fiberglass insulation and […]