Projects

Union Pacific Railroad – Union and Plattsmouth

With a challenging schedule requirement, the Union Pacific Railroad hired Hawkins to replace two separate bridges within 30 days. The work was completed during a “blitz” in which UPRR replaced miles of track. Due to the ongoing train traffic, Hawkins was only allowed five-hour work windows to install all steel H-piling, and two 20-hour time frames to replace the bridges. Hawkins’ bridge replacement work was coordinated with the UPRR track replacement gang of 100 laborers and multiple track replacement machines, requiring an extremely intricate schedule. Construction equipment included a 160-ton crane, excavators, skid loader, and pile hammer.

Project Details

Client:
Union Pacific (UPRR)
Location:
Union, NE and Plattsmouth, NE
Completed:
2016
Value:
Private
Category:
Rail

“Hawkins Construction Company has brought ideas to the District for both cost savings as well as scheduling to keep projects both on time and on budget. To help do this they make time early in the project for both collaborative value engineering as well as learning the intricacies of our projects to avoid potential schedule problems. This understanding of the project helps them with the management of subcontractors and makes for a more organized construction process.”

Michael A. Koenig, P.E.
Director – Major Water Plant Projects