Union Pacific Railroad – Union and Plattsmouth

With a challenging schedule requirement, the Union Pacific Railroad hired Hawkins to replace two separate bridges within 30 days. The work was completed during a “blitz” in which UPRR replaced miles of track. Due to the ongoing train traffic, Hawkins was only allowed five-hour work windows to install all steel H-piling, and two 20-hour time frames to replace the bridges. Hawkins’ bridge replacement work was coordinated with the UPRR track replacement gang of 100 laborers and multiple track replacement machines, requiring an extremely intricate schedule. Construction equipment included a 160-ton crane, excavators, skid loader, and pile hammer.

Project Details

Client:
Union Pacific (UPRR)
Location:
Union, NE and Plattsmouth, NE
Completed:
2016
Value:
Private
Category:
Rail

“Hawkins Construction is a pleasure to do business with- from initial concept, to design and estimating, to quality construction, to final documentation- Hawkins delivers quality projects with a safety emphasis. We have relied on Hawkins for our critical construction projects and they have consistently exceeded our expectations.”

Rob Everist
President - L.G. Everist, Inc.