CALL US NOW

402.342.1607

Projects

EPPLEY AIRFIELD – RUNWAY AND TAXIWAY PROJECTS

Since 1995, we have completed significant runway and taxiway pavement projects at Eppley Airfield. These projects have been technically complicated with stringent specifications and potential hazards due to adjacent aircraft operations. Using highly trained personnel and specialized equipment, we have replaced more than 1,250,000 square yards of full-depth pavement with various base course types, large diameter sewer pipes with associated drainage structures, pump houses, FAA buildings, communication cabling and runway and taxiway lighting. We have built more than 90% of Eppley Airfield pavement.

Most Recent Projects:

Project Quantities for Taxiway A-D-F (2020)
• 43,000 sq yards of 16-inch concrete paving
• 46,000 sq yards of 6-inch cement-treated base
• 78,000 sq yards of 6- to 8-inch P-208 rock
• 62,000 tons of P-154 sand
• 4,000 linear feet of 24- to 48-inch reinforced concrete pipe

Project Quantities for Terminal Ramp Phases 1-3 (2015-2017)
• 154,000 sq yards of 16-inch concrete paving
• 149,000 sq yards of 6-inch cement-treated base
• 149,000 sq yards of 6- to 8-inch P-208 rock
• 122,000 tons of P-154 sand
• 5,800 linear feet of 84- and 96-inch storm sewer
• 171 dewatering wells for storm sewer

Project Details

CLIENT:

Omaha Airport Authority

LOCATION:

Eppley Airfield, Omaha, NE

COMPLETED:

2017

VALUE:

237,000,000

CATEGORY:

Transportation Civil Utility