Projects

Multi-district Repair

Hawkins Construction completed roadway repairs to 28 different project sites throughout two districts of the Nebraska Department of Roads. Spread out over 10 counties in eastern Nebraska, these sites required grading, removal, and guardrail replacement due to years of weathering. Fourteen of the sites required bridge repair, and two needed box culvert repairs.

Hawkins overcame the significant logistical challenges of these multiple project sites by self-performing most of the work with a crew capable of completing multidisciplinary work. Originally scheduled for three years, the fast-tracked construction schedule resulted in completing the contract more than a year and a half early.

Project Details

Client:
Nebraska Department of Roads (NDOR)
Location:
28 project sites throughout NDOR districts 1 and 2
Completed:
2016
Value:
$ 4,000,000
Category:
Diversified Infrastructure Construction & Repair

“I was very pleased with the entire project and would highly recommend Hawkins Construction Company as a company who cares about the end result and achieving the results desired by the owners.”

Jerry Blasig
Vice President of Administration-Bellevue University