Highway 370 Repair

The Highway 370 project in Bellevue, Nebraska, repaired four miles of pavement that was failing at the joints and causing bumpy travel for all vehicles on the busy highway. Starting from the US-75 interchange and heading west, the project consisted of over 10,500 square yards of concrete pavement patching along with extensive bridge repairs to four bridges. An asphalt overlay was also placed over the entire length of the project, resulting in smoother and safer travel for all highway traffic.

Project Details

Client:
Nebraska Department of Roads (NDOR)
Location:
Bellevue, NE
Completed:
2016
Value:
$ 6,434,000
Category:
Diversified Infrastructure Construction & Repair

"Hawkins Construction Company has been a vital partner in building some of Nebraska's most iconic transportation projects — like the West Dodge elevated expressway and the Interstate 80 six-lane between Omaha and Lincoln. Hawkins’ teams consistently help solve problems on-site, create accurate documents, and minimize unnecessary changes — all at extremely competitive prices.”

Randall D. Peters P.E.
NDOR Director-State Engineer, 2012 -2015
Associate Professor of Practice
UNL Department of Civil Engineering