Dakota & Iowa Railroad Bridge Replacements

Hawkins removed and replaced eight separate bridges over two projects. Existing bridges were timber and replaced with H-pile supported precast structures that varied in lengths from 22 feet up to 100 feet. Pile driving was coordinated around train traffic and each bridge superstructure was completely replaced in a one-day track outage. Construction duration for all eight bridges was 5 months.

Project Details

Client:
Dakota & Iowa Railroad (D&I)
Location:
Akron, IA to Elk Point, SD
Completed:
2016