
Rinker
Materials
Location: Valley, Nebraska
Description:
Hawkins Construction was the design/build firm that completed
the 23,000 square-foot concrete pipe manufacturing facility
that included employee locker room, dining room, offices
and 8,000 square-foot steam cure building. The manufacturing
facility houses a fully automated pipe casting machine for
pipe up to 48” diameter.
<--
Return to the Manufacturing & Distribution Index