Airports
  Bridges & Viaducts
  Commercial Office
  Correctional Facilities
  Fleet Maintenance & Service
  Healthcare
  Higher Education
  Hospitality
  Industrial
  K-12 Education
  Life Science
  Manufacturing & Distribution
  Parking Structures
  Religious & Cultural
  Retirement & Assisted Living
  Roads
  Site Development
  Sports & Entertainment
  Sustainable Design/LEED™
  Technology & Data Centers


Becton Dickenson
Location: Columbus, Nebraska

Description: The addition and renovation of BD’s new glass sterilization process required “damage-limiting” construction operations. Specialty construction activities included: stainless steel lined hot boxes (Cold Rooms); ETO Sterilization Process with separate centralized control room; conductive epoxy flooring; separate exhaust and supply systems with purge capabilities; and LEL and PPM Gas Monitoring Systems through MSA and California Analytical furnished controls.

<-- Return to the Manufacturing & Distribution Index